Main Floor: Travel Pete's Travel Lounge
April 2001 The transition began with a paint job - Pumpkin Blush or something
August-September 2003 Transitioning (new floor, furniture, shelf, ceiling fan, lights, table, couch)
The former owner's cats laid waste to the floor & walls, which had to be torn out and repaired
Pergo, the stuff of dreams! Easy as pie to install, excepting above repair work... (my nephew helped)
The mostly finished room, Sep 2003, trying out the true lounge feel with a couch
September 2003

(with tall table added from kitchen)

December 2003

(Room was too busy, removed couch & baker's rack, moved table to corner, put beer fridge back to original location, Max models the new digs!)

Basement floor | Back to Main floor | Top floor | Casa de Fisher index